Violation Period Begin and End Dates

From the help published with Drinking Water Watch 3.5, reproduced as delivered.

The Violation Period Begin Date and the Violation Period End Date indicate the first date and last date of the violation period. These dates are generally used to represent when a water system has not fulfilled a requirement for a one-tine event such as installation of treatment or submittal of a report or documentation. The Begin Date is the day after the requirement was due and the End Date is the day the water system completes the activity or returns to compliance.