Alpha
This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Treatment Facility TF104
Inactive- Facility
- TF104 Kossuth W/A #3-Pine Mountain
- Type
- Treatment Plant (TP)
- Status
- Inactive (I) Activity date October 12, 2015
- Reason
- Merged with 14
Where this facility is sampled
| Sampling point | Description | Type |
|---|---|---|
| TF104 | Treatment Plant T104 | Entry Point |
This page shows active sampling points only and leaves out retired ones and the samples taken at them.