This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Combined Radium (-226 & -228) results
MS0170015 , City of Olive Branch
59 samples have been analysed for Combined Radium (-226 & -228) at City of Olive Branch.
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Combined Radium (-226 & -228) result
The table below lists 21–30 of 59 samples, newest first — collected October 1, 2012 to May 14, 2018.
10 Combined Radium (-226 & -228) results from the 10 samples listed here: 5 detected, 5 not detected. Those samples also carried 25 results for other analytes, which are on the full results page.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 0.95 pci/l , sample collected May 14, 2018 09:00, sampling point WL006 | Combined Radium (-226 & -228) 4010 EPA method 7500-RA | Not recorded |
|
||
| 1.8 pci/l , sample collected Apr 10, 2018 09:57, sampling point TF081 | Combined Radium (-226 & -228) 4010 EPA method 7500-RA | Not recorded |
|
||
| 1.27 pci/l , sample collected Apr 10, 2018 09:30, sampling point TF083 | Combined Radium (-226 & -228) 4010 EPA method 7500-RA | Not recorded |
|
||
| 1.99 pci/l , sample collected Apr 10, 2018 08:47, sampling point TF082 | Combined Radium (-226 & -228) 4010 EPA method 7500-RA | Not recorded |
|
||
| 5.7 pci/l , sample collected Apr 10, 2018 08:12, sampling point TF080 | Combined Radium (-226 & -228) 4010 EPA method 7500-RA | Not recorded |
|
||
| Not detected below 0.25 pci/l Minimum Reporting Level , sample collected Oct 2, 2012 14:17, sampling point TF087 | Combined Radium (-226 & -228) 4010 | Not recorded |
|
||
| Not detected below 0.22 pci/l Minimum Reporting Level , sample collected Oct 2, 2012 14:50, sampling point TF085 | Combined Radium (-226 & -228) 4010 | Not recorded |
|
||
| Not detected below 0.33 pci/l Minimum Reporting Level , sample collected Oct 2, 2012 13:45, sampling point TF086 | Combined Radium (-226 & -228) 4010 | Not recorded |
|
||
| Not detected below 0.25 pci/l Minimum Reporting Level , sample collected Oct 1, 2012 14:35, sampling point TF087 | Combined Radium (-226 & -228) 4010 | Not recorded |
|
||
| Not detected below 0.22 pci/l Minimum Reporting Level , sample collected Oct 1, 2012 14:10, sampling point TF085 | Combined Radium (-226 & -228) 4010 | Not recorded |
-
- Collected
- May 14, 2018 09:00
- Sampling point
- WL006 Well W006
- Sample type
- Routine
- Lab sample
- 3946298
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010 EPA method 7500-RA
- Result
- 0.95 pci/l
-
- Collected
- Apr 10, 2018 09:57
- Sampling point
- TF081 Treatment Plant T081
- Sample type
- Routine
- Lab sample
- 3910456
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010 EPA method 7500-RA
- Result
- 1.8 pci/l
-
- Collected
- Apr 10, 2018 09:30
- Sampling point
- TF083 Treatment Plant T083
- Sample type
- Routine
- Lab sample
- 3910454
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010 EPA method 7500-RA
- Result
- 1.27 pci/l
-
- Collected
- Apr 10, 2018 08:47
- Sampling point
- TF082 Treatment Plant T082
- Sample type
- Routine
- Lab sample
- 3910452
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010 EPA method 7500-RA
- Result
- 1.99 pci/l
-
- Collected
- Apr 10, 2018 08:12
- Sampling point
- TF080 Treatment Plant T080
- Sample type
- Routine
- Lab sample
- 3910450
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010 EPA method 7500-RA
- Result
- 5.7 pci/l
-
- Collected
- Oct 2, 2012 14:17
- Sampling point
- TF087 Treatment Plant T087
- Sample type
- Routine
- Lab sample
- 201301120262
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010
- Result
- Not detected below 0.25 pci/l Minimum Reporting Level
-
- Collected
- Oct 2, 2012 14:50
- Sampling point
- TF085 Treatment Plant T085
- Sample type
- Routine
- Lab sample
- 201301120252
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010
- Result
- Not detected below 0.22 pci/l Minimum Reporting Level
-
- Collected
- Oct 2, 2012 13:45
- Sampling point
- TF086 Treatment Plant T086
- Sample type
- Routine
- Lab sample
- 201301120248
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010
- Result
- Not detected below 0.33 pci/l Minimum Reporting Level
-
- Collected
- Oct 1, 2012 14:35
- Sampling point
- TF087 Treatment Plant T087
- Sample type
- Routine
- Lab sample
- 121002-039
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010
- Result
- Not detected below 0.25 pci/l Minimum Reporting Level
-
- Collected
- Oct 1, 2012 14:10
- Sampling point
- TF085 Treatment Plant T085
- Sample type
- Routine
- Lab sample
- 121002-040
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Combined Radium (-226 & -228) 4010
- Result
- Not detected below 0.22 pci/l Minimum Reporting Level
Routine (10).