Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Stage 2 DBP

Facility
IDSE 23 Naval Construction Battal CTR
Type
Dist System/Zone (DS)
Status
Active (A) Activity date August 9, 2023

Where this facility is sampled

Active sampling points at Stage 2 DBP.
Sampling point Description Type
SM1 Building 5000 Point of Maximum Retention
SM2 Building 274 Midpoint in the Distribution System

This page shows active sampling points only and leaves out retired ones and the samples taken at them.