Alpha
This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
8200 Gallon Pressure Tank at Well #1
- Facility
- ST001 Pineville Project III South
- Type
- Storage (ST)
- Status
- Active (A) Activity date January 17, 2014
Where this facility is sampled
| Sampling point | Description | Type |
|---|---|---|
| ST001 | Tank S001 | Water System Facility point |
This page shows active sampling points only and leaves out retired ones and the samples taken at them.