Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Sample and compliance schedules

MS0250008 , City of Jackson

Coliform schedules

Coliform sampling schedules for City of Jackson, 1 open schedule.
Analyte Sample count Sample type Sample frequency Effective from Effective to Season
Coliform (TCR)
3100
120 Routine Month May 1, 2009 Open Year round

Frequent field sample schedules

Frequent field sample schedules for City of Jackson, 10 open schedules.
Facility Analyte Days per month Samples per day Effective from Effective to Summary type
Treatment Facility TF081 (Fewell)
TF081
Chloramine
1006
31 6 Jun 30, 1993 Open Entry Point RDC
Treatment Facility TF081 (Fewell)
TF081
Chlorine Dioxide
1008
31 1 Jan 1, 2002 Open EP Chlorine Dioxide
Treatment Facility TF081 (Fewell)
TF081
Chlorite
1009
31 1 Jan 1, 2002 Open EP Chlorite
Treatment Facility TF081 (Fewell)
TF081
Turbidity
0100
31 6 Jan 1, 2002 Open CFE Maximum Turbidity
Treatment Facility TF081 (Fewell)
TF081
Turbidity
0100
31 6 Jan 1, 2002 Open CFE 95% Turbidity
Treatment Facility TF082 (Curtis Conven)
TF082
Chloramine
1006
31 6 Jun 30, 1993 Open Entry Point RDC
Treatment Facility TF082 (Curtis Conven)
TF082
Chlorine Dioxide
1008
31 1 Jan 1, 2002 Open EP Chlorine Dioxide
Treatment Facility TF082 (Curtis Conven)
TF082
Chlorite
1009
31 1 Jan 1, 2002 Open EP Chlorite
Treatment Facility TF082 (Curtis Conven)
TF082
Turbidity
0100
31 6 Jan 1, 2002 Open CFE Maximum Turbidity
Treatment Facility TF082 (Curtis Conven)
TF082
Turbidity
0100
31 6 Jan 1, 2002 Open CFE 95% Turbidity

Analyte group schedules

One schedule covers every analyte in the group. SDWIS also holds a separate schedule for each analyte inside it; those are not listed, because the group schedule stands for them. The individual schedules below are the ones that belong to no group.

We withheld the location of 8 sampling points below. The location on record identifies a private home, and we do not publish those. That is our decision, not the agency’s. The sampling point, its type and every result taken there are published unchanged.

Analyte group sampling schedules for City of Jackson, 17 open schedules. One schedule covers every analyte in the group.
Facility Analyte group Sample count Sample type Sample frequency Effective from Effective to Sampling point
Distribution DS000
DS000
Lead & Copper
PBCU
100 Routine 6 Months Jan 1, 2016 Open No Specified Sampling Point
IDSE
IDSE
TTHM/Haa5
DBP
8 Routine Quarter Apr 1, 2012 Open SM11 Location withheld ×1 , SM13 Location withheld ×1 , SM14 Location withheld ×1 , SM15 Location withheld ×1 , SM18 Location withheld ×1 , SM20 Location withheld ×1 , SM7 Location withheld ×1 , SM9 Location withheld ×1
Intake IN071 (Fewell)
IN071
Toc & Alkalinity
TOCA
1 Routine Month Jan 1, 2002 Open No Specified Sampling Point
Intake IN072 (Ob Curtis)
IN072
Toc & Alkalinity
TOCA
1 Routine Month Jan 1, 2002 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Inorganic
IOC
1 Routine 3 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
NO2-NO3
NITR
1 Routine 1 Year Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Soc2026 Final
SC27
1 Routine Quarter Jul 1, 2026 Open TF081 Treatment Plant T081 ×1
Treatment Facility TF081 (Fewell)
TF081
Voc-Regulated
VOC
1 Routine 3 Years Jan 1, 2026 Open TF081 Treatment Plant T081 ×1
Treatment Facility TF082 (Curtis Conven)
TF082
Inorganic
IOC
1 Routine 1 Year Aug 20, 2025 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
NO2-NO3
NITR
1 Routine 1 Year Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Soc2026 Final
SC27
1 Routine Quarter Jul 1, 2026 Open TF082 Treatment Plant T082 ×1
Treatment Facility TF082 (Curtis Conven)
TF082
Voc-Regulated
VOC
1 Routine 3 Years Jan 1, 2026 Open TF082 Treatment Plant T082 ×1
Treatment Facility TF083 (Curtis Membr)
TF083
Gross Alpha
GA
1 Routine Quarter Apr 1, 2020 Mar 31, 2026 No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Inorganic
IOC
1 Routine 3 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
NO2-NO3
NITR
1 Routine 1 Year Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Soc2026 Final
SC27
1 Routine Quarter Jul 1, 2026 Open TF083 Treatment Facility TF083 (Curtis Membr) ×1
Treatment Facility TF083 (Curtis Membr)
TF083
Voc-Regulated
VOC
1 Routine 3 Years Jan 1, 2022 Open No Specified Sampling Point

For DBP samples that are collected from a private residence, refer to the approved monitoring plan for the specific street address of the sampling point.

Individual analyte schedules

Individual analyte sampling schedules for City of Jackson, 21 open schedules.
Facility Analyte Sample count Sample type Sample frequency Effective from Effective to Sampling point
Distribution DS000
DS000
Chlorite
1009
3 Routine Month Jan 1, 2002 Open No Specified Sampling Point
Intake IN071 (Fewell)
IN071
LT2Eswtr
0800
2 OT Month May 1, 2023 Open No Specified Sampling Point
Intake IN072 (Ob Curtis)
IN072
LT2Eswtr
0800
2 OT Month May 1, 2023 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Carbon, Total
2920
1 Routine Month Jan 1, 2002 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Combined Radium (-226 & -228)
4010
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Combined Uranium
4006
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Cyanide
1024
1 Routine Quarter Jul 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Gross Alpha Particle Activity
4109
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF081 (Fewell)
TF081
Sodium
1052
1 Routine 1 Year Jan 1, 2020 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Carbon, Total
2920
1 Routine Month Jan 1, 2002 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Combined Radium (-226 & -228)
4010
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Combined Uranium
4006
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Cyanide
1024
1 Routine 6 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Gross Alpha Particle Activity
4109
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF082 (Curtis Conven)
TF082
Sodium
1052
1 Routine 1 Year Jan 1, 2020 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Carbon, Total
2920
1 Routine Month Apr 1, 2020 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Combined Radium (-226 & -228)
4010
1 Routine 6 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Combined Uranium
4006
1 Routine 9 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Cyanide
1024
1 Routine 6 Years Jan 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Gross Alpha Particle Activity
4109
1 Routine Quarter Apr 1, 2026 Open No Specified Sampling Point
Treatment Facility TF083 (Curtis Membr)
TF083
Sodium
1052
1 Routine 1 Year Jan 1, 2020 Open No Specified Sampling Point

Compliance schedule

This page leaves out activities that were achieved and fell due on or before July 27, 2026.

Compliance schedule activities for City of Jackson, 5 activities.
Activity Due Projected Achieved Reported
A/R Jan 15, 2005 Not recorded Not recorded Not recorded
Aoa Jan 15, 2005 Not recorded Not recorded Not recorded
CCR Jul 1, 2005 Not recorded Not recorded Not recorded
Ieswtr Significant Deficiency (Addt) Sep 30, 2024 Sep 30, 2024 Not recorded Not recorded
Ieswtr Significant Deficiency (Addt) Sep 30, 2024 Sep 30, 2024 Not recorded Not recorded

How to read these tables

These tables do not yet show the monitoring period a schedule currently falls in, or the one after it.

What a sample schedule is

Sample or “monitoring” schedules provide water system owners, operators, and laboratories with the information that lets them know the sampling or monitoring requirements for a specific water system, water system facility, and analyte.

Open schedules are those whose End Date is not valued or is after today.

From the help text published with these pages.

This page leaves out schedules that ended on or before March 25, 2026, so one that ended recently still appears here.

130 schedules ended before that date and are not listed.