Alpha
This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Treatment Facility TF107
- Facility
- TF107 Central W/A-Southwest
- Type
- Treatment Plant (TP)
- Status
- Active (A) Activity date July 10, 2013
- Reason
- 10/13/2010 Merged with 680 07/10/2013 wells placed in service to increase design capacity at southwest
Where this facility is sampled
| Sampling point | Description | Type |
|---|---|---|
| TF107 | Treatment Plant T107 | Entry Point |
This page shows active sampling points only and leaves out retired ones and the samples taken at them.