Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Treatment Facility TF108

Facility
TF108 Central W/A-Southwest
Type
Treatment Plant (TP)
Status
Active (A) Activity date July 10, 2013
Reason
10/13/2010: Merged with 680 07/10/2013: wells placed in service to increase design capacity of southwest

Where this facility is sampled

Active sampling points at Treatment Facility TF108.
Sampling point Description Type
TF108 Entry Point

This page shows active sampling points only and leaves out retired ones and the samples taken at them.