Alpha
This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Treatment Facility TF109
Inactive- Facility
- TF109 Central W/A-Southwest
- Type
- Treatment Plant (TP)
- Status
- Inactive (I) Activity date October 23, 2018
- Reason
- pumping sand will only be used as an emergency
Where this facility is sampled
| Sampling point | Description | Type |
|---|---|---|
| TF109 | Treatment Facility TF109 | Entry Point |
This page shows active sampling points only and leaves out retired ones and the samples taken at them.