This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Chromium results
MS0610015 , Piney Woods Country Life SCH
18 samples have been analysed for Chromium at Piney Woods Country Life SCH.
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Chromium result
The table below lists 1–10 of 18 samples, newest first — collected February 1, 2010 to March 27, 2025.
10 Chromium results from the 10 samples listed here: 8 detected, 2 not detected. Those samples also carried 99 results for other analytes, which are on the full results page.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 0.0005 mg/l , sample collected Mar 27, 2025 07:25, sampling point TF103 | Chromium 1020 EPA method 200.8 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 0.0006 mg/l , sample collected Mar 27, 2025 07:15, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| Not detected below 0.0005 mg/l Minimum Reporting Level , sample collected Oct 20, 2022 13:10, sampling point TF103 | Chromium 1020 EPA method 200.8 | Jan 1, 2020 – Dec 31, 2022 |
|
||
| Not detected below 0.0005 mg/l Minimum Reporting Level , sample collected Oct 20, 2022 13:20, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2020 – Dec 31, 2022 |
|
||
| 0.0009 mg/l , sample collected May 6, 2019, sampling point TF103 | Chromium 1020 EPA method 200.8 | Jan 1, 2017 – Dec 31, 2019 |
|
||
| 0.0017 mg/l , sample collected May 6, 2019 11:15, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2017 – Dec 31, 2019 |
|
||
| 0.0019 mg/l , sample collected May 13, 2013 07:09, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2011 – Dec 31, 2013 |
|
||
| 0.0011 mg/l , sample collected May 13, 2013 09:01, sampling point TF103 | Chromium 1020 EPA method 200.8 | Jan 1, 2011 – Dec 31, 2013 |
|
||
| 0.0018 mg/l , sample collected Feb 1, 2010, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2008 – Dec 31, 2010 |
|
||
| 0.0023 mg/l , sample collected Feb 1, 2010, sampling point TF103 | Chromium 1020 EPA method 200.8 | Jan 1, 2008 – Dec 31, 2010 |
-
- Collected
- Mar 27, 2025 07:25
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- IN-250327-028
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Chromium 1020 EPA method 200.8
- Result
- 0.0005 mg/l
-
- Collected
- Mar 27, 2025 07:15
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- IN-250327-027
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Chromium 1020 EPA method 200.8
- Result
- 0.0006 mg/l
-
- Collected
- Oct 20, 2022 13:10
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- IN-221021-015
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2020 – Dec 31, 2022
-
Chromium 1020 EPA method 200.8
- Result
- Not detected below 0.0005 mg/l Minimum Reporting Level
-
- Collected
- Oct 20, 2022 13:20
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- IN-221021-014
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2020 – Dec 31, 2022
-
Chromium 1020 EPA method 200.8
- Result
- Not detected below 0.0005 mg/l Minimum Reporting Level
-
- Collected
- May 6, 2019
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 190507-010IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2017 – Dec 31, 2019
-
Chromium 1020 EPA method 200.8
- Result
- 0.0009 mg/l
-
- Collected
- May 6, 2019 11:15
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 190507-005IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2017 – Dec 31, 2019
-
Chromium 1020 EPA method 200.8
- Result
- 0.0017 mg/l
-
- Collected
- May 13, 2013 07:09
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 130514-015IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2011 – Dec 31, 2013
-
Chromium 1020 EPA method 200.8
- Result
- 0.0019 mg/l
-
- Collected
- May 13, 2013 09:01
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 130514-014IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2011 – Dec 31, 2013
-
Chromium 1020 EPA method 200.8
- Result
- 0.0011 mg/l
-
- Collected
- Feb 1, 2010
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 100202-024IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2008 – Dec 31, 2010
-
Chromium 1020 EPA method 200.8
- Result
- 0.0018 mg/l
-
- Collected
- Feb 1, 2010
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 100202-023IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2008 – Dec 31, 2010
-
Chromium 1020 EPA method 200.8
- Result
- 0.0023 mg/l
Routine (10).