This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Gross Alpha, Incl. Radon & U results
MS0640011 , Boggan Ridge W/A-Pine Grove
10 samples have been analysed for Gross Alpha, Incl. Radon & U at Boggan Ridge W/A-Pine Grove.
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Gross Alpha, Incl. Radon & U result
All 10 samples analysed for this analyte are listed below, newest first. No date range is applied.
10 Gross Alpha, Incl. Radon & U results from the 10 samples listed here: 10 detected, 0 not detected. Those samples also carried 30 results for other analytes, which are on the full results page.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 0.8 pci/l , sample collected Jul 12, 2012 12:15, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 1 pci/l , sample collected Jul 12, 2012 12:20, sampling point TF102 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Jul 11, 2012 12:05, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 1 pci/l , sample collected Jul 11, 2012 12:10, sampling point TF102 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Apr 18, 2012 12:10, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 1 pci/l , sample collected Apr 18, 2012 12:05, sampling point TF102 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Feb 8, 2012 12:10, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 1 pci/l , sample collected Feb 8, 2012 12:05, sampling point TF102 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Dec 7, 2011 12:15, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 1 pci/l , sample collected Dec 7, 2011 12:20, sampling point TF102 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
-
- Collected
- Jul 12, 2012 12:15
- Sampling point
- TF103
- Sample type
- Routine
- Lab sample
- 201211120004
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Jul 12, 2012 12:20
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 201211120003
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 1 pci/l
-
- Collected
- Jul 11, 2012 12:05
- Sampling point
- TF103
- Sample type
- Routine
- Lab sample
- 120712-028
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Jul 11, 2012 12:10
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 120712-027
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 1 pci/l
-
- Collected
- Apr 18, 2012 12:10
- Sampling point
- TF103
- Sample type
- Routine
- Lab sample
- 120419-082
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Apr 18, 2012 12:05
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 120419-081
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 1 pci/l
-
- Collected
- Feb 8, 2012 12:10
- Sampling point
- TF103
- Sample type
- Routine
- Lab sample
- 120209-041
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Feb 8, 2012 12:05
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 120209-040
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 1 pci/l
-
- Collected
- Dec 7, 2011 12:15
- Sampling point
- TF103
- Sample type
- Routine
- Lab sample
- 111208-049
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Dec 7, 2011 12:20
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 111208-048
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 1 pci/l
Routine (10).