Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

TF082 Chlorinator

Facility
TF082 Cascilla Water Association
Type
Treatment Plant (TP)
Status
Active (A) Activity date July 14, 2020

Where this facility is sampled

Active sampling points at TF082 Chlorinator.
Sampling point Description Type
TF082 Chlorinator TF082 Entry Point

This page shows active sampling points only and leaves out retired ones and the samples taken at them.