Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Nitrate results

MS0690004 , Looxahoma Water Association

105 samples have been analysed for Nitrate at Looxahoma Water Association.

This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.

What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.

No date range is applied: this list draws on every sample on record. Show the last two years only.

Every Nitrate result

The table below lists 31–40 of 105 samples, newest first — collected January 22, 2019 to April 21, 2021.

10 Nitrate results from the 10 samples listed here: 8 detected, 2 not detected. Those samples also carried 20 results for other analytes, which are on the full results page.

Nitrate results for Looxahoma Water Association, from 31 to 40 of 105 samples shown analysed for it, newest first. This view leaves out other analytes on the same samples. Not detected means the amount was below the level the laboratory can reliably report, which is given beside it.
Result Analyte Monitoring period
Collected
Apr 21, 2021 14:45
Sampling point
TF080 Treatment Plant T080
Sample type
Routine
Lab sample
NI-210422-055
Laboratory
MSDH Lab
0.3 mg/l , sample collected Apr 21, 2021 14:45, sampling point TF080 Nitrate 1040 EPA method QC10107041C Jan 1, 2021 – Dec 31, 2021
Collected
Feb 22, 2021 13:00
Sampling point
TF105 Treatment Plant T103
Sample type
Routine
Lab sample
NI-210223-006
Laboratory
MSDH Lab
0.268 mg/l , sample collected Feb 22, 2021 13:00, sampling point TF105 Nitrate 1040 EPA method QC10107041C Jan 1, 2021 – Dec 31, 2021
Collected
May 18, 2020 14:05
Sampling point
TF080 Treatment Plant T080
Sample type
Routine
Lab sample
200519-050NI
Laboratory
MSDH Lab
0.26 mg/l , sample collected May 18, 2020 14:05, sampling point TF080 Nitrate 1040 EPA method QC10107041C Jan 1, 2020 – Dec 31, 2020
Collected
May 18, 2020 14:15
Sampling point
TF081 Treatment Plant T081
Sample type
Routine
Lab sample
200519-045NI
Laboratory
MSDH Lab
0.26 mg/l , sample collected May 18, 2020 14:15, sampling point TF081 Nitrate 1040 EPA method QC10107041C Jan 1, 2020 – Dec 31, 2020
Collected
May 18, 2020 12:15
Sampling point
TF101 Treatment Plant T101
Sample type
Routine
Lab sample
200519-029NI
Laboratory
MSDH Lab
Not detected below 0.08 mg/l Minimum Reporting Level , sample collected May 18, 2020 12:15, sampling point TF101 Nitrate 1040 EPA method QC10107041C Jan 1, 2020 – Dec 31, 2020
Collected
May 18, 2020 12:05
Sampling point
TF102 Treatment Plant T102
Sample type
Routine
Lab sample
200519-020NI
Laboratory
MSDH Lab
Not detected below 0.08 mg/l Minimum Reporting Level , sample collected May 18, 2020 12:05, sampling point TF102 Nitrate 1040 EPA method QC10107041C Jan 1, 2020 – Dec 31, 2020
Collected
May 7, 2019 15:00
Sampling point
TF105 Treatment Plant T103
Sample type
Routine
Lab sample
190508-010NI
Laboratory
MSDH Lab
0.26 mg/l , sample collected May 7, 2019 15:00, sampling point TF105 Nitrate 1040 EPA method QC10107041C Apr 1, 2019 – Jun 30, 2019
Collected
Jan 22, 2019 13:25
Sampling point
TF105 Treatment Plant T103
Sample type
Routine
Lab sample
190123-030NI
Laboratory
MSDH Lab
0.23 mg/l , sample collected Jan 22, 2019 13:25, sampling point TF105 Nitrate 1040 EPA method QC10107041C Jan 1, 2019 – Mar 31, 2019
Collected
Jan 22, 2019 13:30
Sampling point
TF080 Treatment Plant T080
Sample type
Routine
Lab sample
190123-020NI
Laboratory
MSDH Lab
0.23 mg/l , sample collected Jan 22, 2019 13:30, sampling point TF080 Nitrate 1040 EPA method QC10107041C Jan 1, 2019 – Dec 31, 2019
Collected
Jan 22, 2019 13:35
Sampling point
TF081 Treatment Plant T081
Sample type
Routine
Lab sample
190123-010NI
Laboratory
MSDH Lab
0.23 mg/l , sample collected Jan 22, 2019 13:35, sampling point TF081 Nitrate 1040 EPA method QC10107041C Jan 1, 2019 – Dec 31, 2019

Routine (10).