This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Chromium results
MS0760014 , City of Greenville (Airbase)
19 samples have been analysed for Chromium at City of Greenville (Airbase).
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Chromium result
The table below lists 1–10 of 19 samples, newest first — collected March 1, 2010 to April 1, 2025.
10 Chromium results from the 10 samples listed here: 8 detected, 2 not detected. Those samples also carried 99 results for other analytes, which are on the full results page.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 0.0015 mg/l , sample collected Apr 1, 2025 12:15, sampling point TF101 | Chromium 1020 EPA method 200.8 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 0.0031 mg/l , sample collected Feb 6, 2024 13:55, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 0.0007 mg/l , sample collected Nov 28, 2022 10:10, sampling point TF101 | Chromium 1020 EPA method 200.8 | Jan 1, 2020 – Dec 31, 2022 |
|
||
| Not detected below 0.0005 mg/l Minimum Reporting Level , sample collected May 20, 2019 01:30, sampling point TF101 | Chromium 1020 EPA method 200.8 | Jan 1, 2017 – Dec 31, 2019 |
|
||
| Not detected below 0.0005 mg/l Minimum Reporting Level , sample collected May 20, 2019 02:10, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2017 – Dec 31, 2019 |
|
||
| 0.0013 mg/l , sample collected Dec 12, 2016 03:15, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2014 – Dec 31, 2016 |
|
||
| 0.0013 mg/l , sample collected Dec 12, 2016 03:00, sampling point TF101 | Chromium 1020 EPA method 200.8 | Jan 1, 2014 – Dec 31, 2016 |
|
||
| 0.0027 mg/l , sample collected May 28, 2013 03:20, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2011 – Dec 31, 2013 |
|
||
| 0.0035 mg/l , sample collected May 28, 2013 03:30, sampling point TF101 | Chromium 1020 EPA method 200.8 | Jan 1, 2011 – Dec 31, 2013 |
|
||
| 0.0038 mg/l , sample collected Mar 1, 2010, sampling point TF102 | Chromium 1020 EPA method 200.8 | Jan 1, 2008 – Dec 31, 2010 |
-
- Collected
- Apr 1, 2025 12:15
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- IN-250402-027
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Chromium 1020 EPA method 200.8
- Result
- 0.0015 mg/l
-
- Collected
- Feb 6, 2024 13:55
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- IN-240207-005
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Chromium 1020 EPA method 200.8
- Result
- 0.0031 mg/l
-
- Collected
- Nov 28, 2022 10:10
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- IN-221129-031
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2020 – Dec 31, 2022
-
Chromium 1020 EPA method 200.8
- Result
- 0.0007 mg/l
-
- Collected
- May 20, 2019 01:30
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- 190521-041IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2017 – Dec 31, 2019
-
Chromium 1020 EPA method 200.8
- Result
- Not detected below 0.0005 mg/l Minimum Reporting Level
-
- Collected
- May 20, 2019 02:10
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 190521-037IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2017 – Dec 31, 2019
-
Chromium 1020 EPA method 200.8
- Result
- Not detected below 0.0005 mg/l Minimum Reporting Level
-
- Collected
- Dec 12, 2016 03:15
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 161213-187IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2014 – Dec 31, 2016
-
Chromium 1020 EPA method 200.8
- Result
- 0.0013 mg/l
-
- Collected
- Dec 12, 2016 03:00
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- 161213-186IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2014 – Dec 31, 2016
-
Chromium 1020 EPA method 200.8
- Result
- 0.0013 mg/l
-
- Collected
- May 28, 2013 03:20
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 130529-050IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2011 – Dec 31, 2013
-
Chromium 1020 EPA method 200.8
- Result
- 0.0027 mg/l
-
- Collected
- May 28, 2013 03:30
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- 130529-041IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2011 – Dec 31, 2013
-
Chromium 1020 EPA method 200.8
- Result
- 0.0035 mg/l
-
- Collected
- Mar 1, 2010
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- 100302-057IN
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2008 – Dec 31, 2010
-
Chromium 1020 EPA method 200.8
- Result
- 0.0038 mg/l
Routine (10).