Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Treatment Facility TF115

Facility
TF115 Black Bayou Water Assn.
Type
Treatment Plant (TP)
Status
Active (A) Activity date October 31, 2024
Reason
Merged with 1267

Where this facility is sampled

Active sampling points at Treatment Facility TF115.
Sampling point Description Type
TF115 Treatment Plant T103 Entry Point

This page shows active sampling points only and leaves out retired ones and the samples taken at them.