Alpha
This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
12 K Pressure Tank
- Facility
- ST002 Buffalo Water Association
- Type
- Storage (ST)
- Status
- Active (A) Activity date April 14, 2014
- Reason
- moved from hwy. 563 plant to Doloroso to replace 4,000 gallon pressure tank
Where this facility is sampled
| Sampling point | Description | Type |
|---|---|---|
| ST002 | 12 K Pressure Tank | Distribution System |
This page shows active sampling points only and leaves out retired ones and the samples taken at them.