This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Sodium results
MS0250012 , City of Jackson-Maddox Rd.
12 samples have been analysed for Sodium at City of Jackson-Maddox Rd..
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Sodium result
The table below lists 1–10 of 12 samples, newest first — collected January 31, 2022 to February 5, 2025.
10 Sodium results from the 10 samples listed here: 10 detected, 0 not detected.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 141 mg/l , sample collected Feb 5, 2025 07:49, sampling point TF107 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 139 mg/l , sample collected Feb 5, 2025 08:11, sampling point TF106 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 139 mg/l , sample collected Feb 5, 2025 08:30, sampling point TF105 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 144 mg/l , sample collected Feb 5, 2025 07:39, sampling point TF103 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 151 mg/l , sample collected Feb 5, 2025 08:19, sampling point TF102 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 140 mg/l , sample collected Feb 5, 2025 07:30, sampling point TF101 | Sodium 1052 EPA method 200.7 | Jan 1, 2023 – Dec 31, 2025 |
|
||
| 97.4 mg/l , sample collected Jan 31, 2022 08:18, sampling point TF107 | Sodium 1052 EPA method 200.7 | Not recorded |
|
||
| 100 mg/l , sample collected Jan 31, 2022 09:07, sampling point TF106 | Sodium 1052 EPA method 200.7 | Not recorded |
|
||
| 95.9 mg/l , sample collected Jan 31, 2022 09:40, sampling point TF105 | Sodium 1052 EPA method 200.7 | Not recorded |
|
||
| 101 mg/l , sample collected Jan 31, 2022 08:38, sampling point TF103 | Sodium 1052 EPA method 200.7 | Not recorded |
-
- Collected
- Feb 5, 2025 07:49
- Sampling point
- TF107 Treatment Plant T107
- Sample type
- Routine
- Lab sample
- NA-250206-022
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 141 mg/l
-
- Collected
- Feb 5, 2025 08:11
- Sampling point
- TF106 Treatment Plant T106
- Sample type
- Routine
- Lab sample
- NA-250206-023
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 139 mg/l
-
- Collected
- Feb 5, 2025 08:30
- Sampling point
- TF105 Treatment Plant T105
- Sample type
- Routine
- Lab sample
- NA-250206-025
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 139 mg/l
-
- Collected
- Feb 5, 2025 07:39
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- NA-250206-021
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 144 mg/l
-
- Collected
- Feb 5, 2025 08:19
- Sampling point
- TF102 Treatment Plant T102
- Sample type
- Routine
- Lab sample
- NA-250206-024
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 151 mg/l
-
- Collected
- Feb 5, 2025 07:30
- Sampling point
- TF101 Treatment Plant T101
- Sample type
- Routine
- Lab sample
- NA-250206-020
- Laboratory
- MSDH Lab
- Monitoring period
- Jan 1, 2023 – Dec 31, 2025
-
Sodium 1052 EPA method 200.7
- Result
- 140 mg/l
-
- Collected
- Jan 31, 2022 08:18
- Sampling point
- TF107 Treatment Plant T107
- Sample type
- Routine
- Lab sample
- NA-220131-002
- Laboratory
- MSDH Lab
- Monitoring period
- Not recorded
-
Sodium 1052 EPA method 200.7
- Result
- 97.4 mg/l
-
- Collected
- Jan 31, 2022 09:07
- Sampling point
- TF106 Treatment Plant T106
- Sample type
- Routine
- Lab sample
- NA-220131-003
- Laboratory
- MSDH Lab
- Monitoring period
- Not recorded
-
Sodium 1052 EPA method 200.7
- Result
- 100 mg/l
-
- Collected
- Jan 31, 2022 09:40
- Sampling point
- TF105 Treatment Plant T105
- Sample type
- Routine
- Lab sample
- NA-220131-005
- Laboratory
- MSDH Lab
- Monitoring period
- Not recorded
-
Sodium 1052 EPA method 200.7
- Result
- 95.9 mg/l
-
- Collected
- Jan 31, 2022 08:38
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- NA-220131-001
- Laboratory
- MSDH Lab
- Monitoring period
- Not recorded
-
Sodium 1052 EPA method 200.7
- Result
- 101 mg/l
Routine (10).