This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.
Gross Alpha, Incl. Radon & U results
MS0550005 , Pearl River Central W/A
12 samples have been analysed for Gross Alpha, Incl. Radon & U at Pearl River Central W/A.
This is one analyte out of the system’s whole record. For what has ever been detected here, and when, see all chemical and radiological results; for everything the system is tested for, see the analyte list.
What counts as a non-detect is defined in the help: Less than Indicator. This system’s violations.
No date range is applied: this list draws on every sample on record. Show the last two years only.
Every Gross Alpha, Incl. Radon & U result
The table below lists 1–10 of 12 samples, newest first — collected May 24, 2012 to September 11, 2019.
10 Gross Alpha, Incl. Radon & U results from the 10 samples listed here: 10 detected, 0 not detected. Those samples also carried 24 results for other analytes, which are on the full results page.
| Result | Analyte | Monitoring period |
|---|---|---|
|
||
| 2.3 pci/l , sample collected Sep 11, 2019 10:42, sampling point TF105 | Gross Alpha, Incl. Radon & U 4002 EPA method 7110B | Jan 1, 2019 – Dec 31, 2027 |
|
||
| 4.3 pci/l , sample collected Dec 4, 2018 12:15, sampling point TF105 | Gross Alpha, Incl. Radon & U 4002 EPA method 7110B | Jan 1, 2010 – Dec 31, 2018 |
|
||
| 0.4 pci/l , sample collected Oct 12, 2012 13:50, sampling point TF104 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Oct 12, 2012 13:05, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.4 pci/l , sample collected Oct 11, 2012 12:39, sampling point TF104 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Oct 11, 2012 12:10, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.4 pci/l , sample collected Aug 9, 2012 12:47, sampling point TF104 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected Aug 9, 2012 12:10, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.4 pci/l , sample collected May 24, 2012 12:20, sampling point TF104 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
|
||
| 0.8 pci/l , sample collected May 24, 2012 12:05, sampling point TF103 | Gross Alpha, Incl. Radon & U 4002 EPA method 00-02 | Not recorded |
-
- Collected
- Sep 11, 2019 10:42
- Sampling point
- TF105 Treatment Plant T105
- Sample type
- Routine
- Lab sample
- 4419910
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Jan 1, 2019 – Dec 31, 2027
-
Gross Alpha, Incl. Radon & U 4002 EPA method 7110B
- Result
- 2.3 pci/l
-
- Collected
- Dec 4, 2018 12:15
- Sampling point
- TF105 Treatment Plant T105
- Sample type
- Routine
- Lab sample
- 4143314
- Laboratory
- Eurofins Eaton Analytical South Bend in
- Monitoring period
- Jan 1, 2010 – Dec 31, 2018
-
Gross Alpha, Incl. Radon & U 4002 EPA method 7110B
- Result
- 4.3 pci/l
-
- Collected
- Oct 12, 2012 13:50
- Sampling point
- TF104 Treatment Plant T104
- Sample type
- Routine
- Lab sample
- 201301110378
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.4 pci/l
-
- Collected
- Oct 12, 2012 13:05
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 201301110375
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Oct 11, 2012 12:39
- Sampling point
- TF104 Treatment Plant T104
- Sample type
- Routine
- Lab sample
- 121012-064
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.4 pci/l
-
- Collected
- Oct 11, 2012 12:10
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 121012-040
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- Aug 9, 2012 12:47
- Sampling point
- TF104 Treatment Plant T104
- Sample type
- Routine
- Lab sample
- 120810-064
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.4 pci/l
-
- Collected
- Aug 9, 2012 12:10
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 120810-025
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
-
- Collected
- May 24, 2012 12:20
- Sampling point
- TF104 Treatment Plant T104
- Sample type
- Routine
- Lab sample
- 120525-042
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.4 pci/l
-
- Collected
- May 24, 2012 12:05
- Sampling point
- TF103 Treatment Plant T103
- Sample type
- Routine
- Lab sample
- 120525-041
- Laboratory
- Radiation Safety Engineering
- Monitoring period
- Not recorded
-
Gross Alpha, Incl. Radon & U 4002 EPA method 00-02
- Result
- 0.8 pci/l
Routine (10).